Hospital Net Zero

Hospital Engineering Explorer

Choose a hospital area to see its engineering systems, principal risk, verification points, tools and lessons.

Illustrative guide. Educational and screening material only. It supports qualified professional judgment and does not determine code compliance, replace your hospital's policies or the advice of qualified engineers, clinicians and infection-prevention staff.

Operating rooms

Rooms where infection risk and dependence on power, ventilation and gases are all at their highest.

Primary engineering systems

  • HVAC with high air-change rates and filtration
  • Essential electrical power and, where required, isolated power
  • Medical gas, vacuum and anesthetic gas scavenging
  • Pressure, temperature and humidity control

Principal risk to assess

Loss of environmental control or critical power during a procedure.

Engineering considerations

  • Positive pressure relative to adjacent spaces is normally maintained by supply exceeding exhaust
  • Temperature and humidity limits are set with surgical teams
  • Energy setbacks are allowed only where the adopted edition and the hospital's risk assessment permit them, with pressure maintained
  • Every change to air handling needs clinical, infection prevention and engineering sign-off

Reference values (orientation only)

  • Operating room: positive pressure, about 20 total and 4 outdoor air changes per hour (ASHRAE 170, 2021-era table)

Reference values are shown for orientation only. Room classes and values change between editions and between jurisdictions. Each value names the room type and the table edition it came from. They are examples, not requirements for every hospital, code edition or jurisdiction. Confirm the exact room classification and values in the edition adopted for your project and with your own risk assessment.

What to verify before and after changes

  • Differential pressure and airflow direction at doors
  • Supply, exhaust and total and outdoor air change rates
  • Temperature and humidity at the clinical set points
  • Alarms working and records kept
  • Essential power and gas alarms tested

Intensive care units

Patients depend continuously on power, oxygen, suction and monitoring, so single failures matter.

Primary engineering systems

  • Essential electrical power on all critical branches
  • Medical gases and vacuum with alarms
  • HVAC with temperature control and filtration
  • Nurse call and monitoring on emergency power

Principal risk to assess

Loss of power, oxygen or vacuum to ventilated patients.

Engineering considerations

  • Redundancy of sources and alarm visibility matter more than energy savings
  • Any shutdown needs a patient-specific plan, including backup supply
  • Rooms may need to be converted for isolation use, so pressure and ventilation capability matter

Reference values (orientation only)

  • Critical-care patient station: about 6 total and 2 outdoor air changes per hour (ASHRAE 170, 2021-era table)

Reference values are shown for orientation only. Room classes and values change between editions and between jurisdictions. Each value names the room type and the table edition it came from. They are examples, not requirements for every hospital, code edition or jurisdiction. Confirm the exact room classification and values in the edition adopted for your project and with your own risk assessment.

What to verify before and after changes

  • Essential power available at every bed location
  • Gas and vacuum alarms tested
  • Temperature and ventilation within criteria
  • Emergency response drill conducted

Isolation and protective-environment rooms

Rooms where air direction is the safety feature: in for infectious patients, out for vulnerable ones.

Primary engineering systems

  • Dedicated supply and exhaust with controlled offset
  • Differential pressure monitors and alarms
  • Anterooms where required
  • Exhaust arrangements and filtration as required

Principal risk to assess

Reversal of pressure, allowing contaminated air to move to the wrong place.

Engineering considerations

  • Airborne infection isolation rooms are kept negative to the corridor; protective environment rooms are kept positive
  • Alarms and monitors are part of the safety system, never to be disabled
  • Door closure, sealing and leakage affect pressure more than people expect

Reference values (orientation only)

  • Airborne infection isolation room: negative pressure, about 12 total and 2 outdoor air changes per hour (ASHRAE 170, 2021-era table)
  • Protective environment room: positive pressure, about 12 total and 2 outdoor air changes per hour (ASHRAE 170, 2021-era table)

Reference values are shown for orientation only. Room classes and values change between editions and between jurisdictions. Each value names the room type and the table edition it came from. They are examples, not requirements for every hospital, code edition or jurisdiction. Confirm the exact room classification and values in the edition adopted for your project and with your own risk assessment.

What to verify before and after changes

  • Direction of airflow with smoke at the door
  • Differential pressure at the monitor and a calibrated meter
  • Air change rate
  • Alarm function and response time

Emergency department

Unpredictable demand and many patients with unknown infectious status; surge capacity matters.

Primary engineering systems

  • Essential power, including imaging and resuscitation areas
  • HVAC with isolation capability and surge capacity
  • Medical gases and communication systems
  • Backup supply and decontamination readiness

Principal risk to assess

Loss of capacity or isolation capability during surge conditions.

Engineering considerations

  • Triage and waiting areas may need flexible ventilation arrangements
  • Plan for surge: additional gas demand and power
  • Resilience of imaging and communications on essential power

Reference values (orientation only)

  • ED examination or treatment room: about 6 total and 2 outdoor air changes per hour (ASHRAE 170, 2021-era table)
  • ED public waiting area: about 12 total and 2 outdoor air changes per hour (ASHRAE 170, 2021-era table)
  • ED decontamination room: about 12 total and 2 outdoor air changes per hour (ASHRAE 170, 2021-era table)
  • Trauma or resuscitation rooms are a separate room type with their own table row. Look up the value in the edition you adopt; it is not given here.

Reference values are shown for orientation only. Room classes and values change between editions and between jurisdictions. Each value names the room type and the table edition it came from. They are examples, not requirements for every hospital, code edition or jurisdiction. Confirm the exact room classification and values in the edition adopted for your project and with your own risk assessment.

What to verify before and after changes

  • Essential power coverage of resuscitation and imaging
  • Isolation room function
  • Gas supply for surge
  • Drill results and corrective actions

Sterile processing

Controlled flow from dirty to clean, with steam, water quality and ventilation all critical to patient safety.

Primary engineering systems

  • Steam and water treatment for sterilizers and washers
  • HVAC with pressure relationships between decontamination and clean areas
  • Compressed air, drainage and electrical supply
  • Temperature and humidity control

Principal risk to assess

Loss of steam, water quality or pressure relationships, which can stop instrument reprocessing and surgery.

Engineering considerations

  • Decontamination areas are kept negative relative to clean areas, and clean assembly areas positive
  • Water and steam quality affect equipment and results
  • Equipment replacement needs a plan for continuing reprocessing
  • Work close to this area needs ICRA review

Reference values (orientation only)

  • Decontamination areas negative and clean assembly and sterile storage areas positive relative to adjacent spaces (see the adopted edition for values)

Reference values are shown for orientation only. Room classes and values change between editions and between jurisdictions. Each value names the room type and the table edition it came from. They are examples, not requirements for every hospital, code edition or jurisdiction. Confirm the exact room classification and values in the edition adopted for your project and with your own risk assessment.

What to verify before and after changes

  • Pressure direction between zones
  • Steam and water quality records
  • Temperature and humidity records
  • Backup reprocessing plan

Central energy plant

Chillers, boilers, pumps, switchgear and generators that every clinical area depends on.

Primary engineering systems

  • Chilled water plant and cooling towers
  • Boilers and steam or hot water distribution
  • Medium-voltage switchgear, transformers and generators
  • Controls, metering and fuel storage

Principal risk to assess

Single points of failure that affect many departments at once.

Engineering considerations

  • N+1 or better redundancy must be preserved during maintenance and efficiency work
  • Measure first: sub-meter large loads before choosing measures
  • Cooling tower makeup water and fuel storage create dependencies
  • Refrigerant machinery rooms have separate safety requirements

Reference values (orientation only)

  • Refrigerant machinery rooms are covered by ASHRAE Standard 15 and local codes

Reference values are shown for orientation only. Room classes and values change between editions and between jurisdictions. Each value names the room type and the table edition it came from. They are examples, not requirements for every hospital, code edition or jurisdiction. Confirm the exact room classification and values in the edition adopted for your project and with your own risk assessment.

What to verify before and after changes

  • Capacity margin with the largest unit out of service
  • Metering data and calibration
  • Redundancy of fuel and water supplies
  • Test records for generators and transfer switches

Clinical laboratory

Mixed hazards, high ventilation demand and equipment that needs steady power and temperature.

Primary engineering systems

  • Laboratory exhaust and fume hoods
  • Biosafety cabinets and pressure relationships
  • Chilled water, process cooling and emergency power for analyzers and freezers
  • Specialty gases and water

Principal risk to assess

Loss of exhaust, cooling or power affecting hazardous work or stored specimens.

Engineering considerations

  • Ventilation is set by hazard assessment, not by default values
  • Variable air volume and setbacks need safe design and verification
  • Freezers and analyzers need power and temperature monitoring and alarms

Reference values (orientation only)

  • Laboratory ventilation depends on the hazard assessment and applicable laboratory standards

Reference values are shown for orientation only. Room classes and values change between editions and between jurisdictions. Each value names the room type and the table edition it came from. They are examples, not requirements for every hospital, code edition or jurisdiction. Confirm the exact room classification and values in the edition adopted for your project and with your own risk assessment.

What to verify before and after changes

  • Hood face velocity and exhaust verification by qualified personnel
  • Pressure relationships
  • Alarms and power for critical equipment
  • Safety review before ventilation changes

Facility types

Hospitals differ. Use the same principles but adapt them to the type of facility.

Academic medical center

Large, complex campus with research laboratories, many operating rooms and very high loads. Central plants and redundancy are extensive, but so are interdependencies. Benchmark against comparable hospitals, not outpatient buildings.

Community hospital

Mid-size general hospital with core inpatient, surgery and emergency services. Typical focus: plant efficiency, resilience of the central plant and essential power, and a small engineering team that carries many roles.

Critical-access hospital

Small rural hospital with limited beds and often limited redundancy and staffing. Single points of failure and dependence on a few suppliers (fuel, oxygen, water) are the main risks. Backup plans and mutual aid matter.

Specialty hospital

Focused services such as orthopedic, cardiac, women's, children's or behavioral health. Space criteria and safety needs differ: for example, behavioral health spaces have specific safety requirements, and surgical specialty hospitals concentrate operating rooms.

Outpatient and ambulatory facility

Clinics, imaging centers and ambulatory surgery. Operating hours and loads differ from inpatient hospitals. ENERGY STAR distinguishes general medical and surgical hospitals from other healthcare property types, so do not apply an inpatient hospital benchmark to an outpatient building.