Hospital Net Zero

Data and methods

How the estimator and calculators work, and what they leave out.

Estimator calculation

Baseline emissions (tCO₂e) = annual electricity (MWh) × grid factor (kgCO₂e/kWh). The units reduce directly: 1 MWh × 1 kg/kWh = 1 tonne.

After measures = max(MWh × (1 − demand reduction) − on-site solar, 0) × grid factor. On-site solar means PV generation consumed behind the meter, treated as displacing purchased grid electricity one-for-one. Exported energy, battery losses, export limits and your inventory boundary are not modelled, so the result is a planning estimate, not a verified GHG inventory, and it does not by itself show that a hospital has reached net zero. Always state the factor year, geography and boundary you used.

Boundaries

Data

Calculator formulas

Every calculator is a pure function of its inputs, checked against hand-calculated cases. Constants live in one table (reference data).

Corrections

Found an error? Email info@hospitalnetzero.com. Corrections are made on the page and noted here. Last reviewed 2026-11-04.