Emergency power assessment
Screen generator loading by branch and estimate fuel autonomy against a stated requirement.
Emergency power assessmentScreening record
A planning assumption. Use your engine's fuel curve.
Connected loads
Branches: life = life safety, crit = critical, equip = equipment system, non = not on the generator. Demand factor is the share of connected load running at the same time.
Results
Not included: motor-starting surge, step-loading, power factor, harmonics, altitude and temperature derating beyond what you enter, and future changes. A qualified electrical engineer must size and verify the system.