Three traced cases: heat-recovery water preheating, thermal storage and solar feasibility. Every number can be reproduced with a calculator or spreadsheet.

Inputs are example values, not project data. The purpose is to let an engineer reproduce each step, not to suggest these results apply to any hospital. Results are screening-level and the models have not been independently engineering-reviewed.

Heat-recovery water preheater with a manufacturer map (case H4)

Room air 83 °F and 125 °F target are interpolated on a 3×3 manufacturer grid (bilinear, no extrapolation). Heat to water is limited by demand, by source heat, or by unit capacity, whichever is smallest.

Inputs

FieldValue
rec60
hrs6000
cap50
troom83
cop03.0
dcop0.3
rlift65
dlift0.25
gpd3000
tin60
tout125
days365
eff80
gp1.2
ep0.12
kwt0.9
coin100
ef0.348
cpx60000
om1000
copTab70,110,30,10 | 70,130,28,11 | 70,150,25,12 | 90,110,36,10.5 | 90,130,34,11.5 | 90,150,31,12.5 | 110,110,42,11 | 110,130,40,12 | 110,150,37,13

Hand calculation versus calculator

QuantityEquationIndependentCalculator
COP at the operating pointbilinear capacity / bilinear input2.925512.92551
Hot-water heat demand (kWh/yr)gal/day x 8.34 x dT / 3,412.142 x days173,967173,967
Recoverable source heat (kWh/yr)kW x hours x capture %180,000180000
Heat delivered (kWh/yr)min(demand, source x COP/(COP-1), capacity x hours)173,967173,967
Electricity (kWh/yr)heat / COP59,465.559,465.5
Heat taken from room air (kWh/yr)heat - electricity114,501114,501
Gas displaced (therms/yr)heat x 3.412141633 / 100 / boiler efficiency7,419.997,419.99
Net annual benefitgas saved + cooling credit - electricity - O&M4,284.384,284.38

Energy balance check: heat delivered = heat from room air + electrical input. Here demand is the smallest of the three limits, so cover is 100%; reduce the gal/day or enter fewer heat-recovery hours to see the source or unit capacity limit instead.

Thermal storage with a 500-ton outage reserve (case T6)

Shifts half of a 1,500-ton, 6-hour on-peak load. Charging capacity available = (installed - reserve) x (1 - derate) - concurrent load.

Inputs

FieldValue
tons1500
hrs6
shift50
days150
kwt0.75
kwi1.0
loss5
aux60
chg8
pOn0.18
pOff0.07
dem15
dem20
dmo5
efOn0.4
efOff0.34
cpx150
om15000
ft33
capInst2500
capLoad900
derate30
dcr80
pvShare0
pvVal0.04
dayP0.1
efDay0.3
pen10
red500

Hand calculation versus calculator

QuantityEquationIndependentCalculator
Shifted energy (ton-h/day)tons x hours x share4,5004500
Storage to charge (ton-h)shifted / (1 - loss)4,736.844,736.84
Charging load needed (tons)charge ton-h / charging hours592.105592.105
Charging capacity available (tons)(installed - reserve) x (1 - derate) - concurrent500500
Energy bill saving ($/yr)(on-peak avoided - off-peak charging - auxiliary) x days26,628.226,628.2
Net annual benefit ($/yr)energy + demand credit - penalty - O&M41,778.241,778.2

Charging needs more tons than are available once the reserve is held back, so the tool reports the design as not feasible as entered and gives no payback, even though the bill arithmetic is positive.

Solar feasibility with inverter replacement and residual value (case S4)

Roof and canopy arrays with year-12 inverter replacement, residual value at the end, real discount rate and escalation.

Inputs

FieldValue
roofA120000
roofU45
roofD11
canA60000
canD15
yld1500
deg0.5
life25
ilr1.25
sun10
dayMwh12300
minKw1800
load22350
retail0.12
expOk1
expRate0.04
cost1.9
om18
extra150000
ef0.348
invYr12
invCost90
resid150000
disc5
esc2

Hand calculation versus calculator

QuantityEquationIndependentCalculator
Array size (kWdc)roof area x usable % x W/ft2 + canopy area x W/ft21,4941494
Year-1 generation (kWh)kWdc x specific yield2.241e+062241000
Year-1 on-site use (kWh)15-min half-sine day vs flat solar-hour load, clipped at inverter AC2.241e+062241000
Capital cost ($)roof + canopy + extras2.9886e+062988600
Annual O&M ($)kWdc x $/kWdc-yr26,89226892
Net present value ($)sum of discounted net cash + residual - first cost1.00367e+061.00367e+06
Internal rate of return (%)rate where NPV = 0 (bisection)7.860517.86051
Discounted payback (year)first year cumulative discounted cash >= 01717

The same inputs run in an external spreadsheet should reproduce the NPV to within rounding.