Hospital Net Zero

Solar PV feasibility screen (roof and canopy)

Screen rooftop and parking-canopy solar from usable area, daytime demand, cost, O&M and export rules before commissioning a study.

What this page is: one calculator that runs in your browser and stores nothing. Sources and limits are on the calculators page; for a linked 42-sheet model use the engineering toolkit.

Limits of this tool. Representative-day screening with real-terms discounting (NPV, IRR, discounted payback). It does not use 8,760-hour PV or interval load data, demand-charge billing, taxes, rebates or financing. Hourly matching is needed for investment decisions; annual electricity must be at least the solar-hour electricity entered. Governing documents to consult: NREL PVWatts and hourly meter data.
Solar PV feasibility screen (roof and canopy)Early stage
About this tool

What it does: Screens rooftop and parking-canopy solar: usable area, generation, daytime demand, cost, O&M and export.

Background: Early PV screening compares what fits with what the hospital can use during solar hours and what the utility allows you to export.

Benefit: Tells you whether a project is worth a yield, structural and interconnection study.

Equations, units, assumptions and limits

Units: ft2, Wdc/ft2, kWdc, kWh, kW, $/Wdc, $/kWdc-yr, $/kWh.

Default assumptions: Example 120,000 ft2 roof (45% usable) plus 60,000 ft2 canopy; 1,500 kWh/kWdc; DC/AC 1.25; export at 0.04 $/kWh; $1.90/Wdc roof and $2.60/Wdc canopy, a $90/kWac inverter replacement in year 12, plus a $150,000 structural and interconnection allowance.

Limits: Representative-day model with a sensitivity range driven by the minimum daytime demand, not hourly: no real hourly PV or load data, shading, soiling, structural capacity or utility study. The inverter replacement is a single undiscounted cost: it appears in lifetime net value and lifetime cost per kWh but not in simple payback. No peak-demand credit and no backup-power capability are assumed.

Level: screening estimate. It supports planning and prioritizing, not design, procurement or a performance guarantee. Detailed engineering by qualified local professionals is required before any project.

After setbacks, equipment, skylights, shade, access and structural limits.
Take from NREL PVWatts or a yield study for your site.
Array kWdc divided by inverter kWac.
Sets the width of the representative-day PV curve.
From interval data, roughly 8 am to 4 pm.
Lowest sustained demand in solar hours. Midday PV above this may export.
Net-metering or export tariff rate.
Use a quote for roof-mounted modules, racking, DC and AC wiring and commissioning.
Canopies add steel, foundations and lighting or drainage work, so they usually cost more than roofs. Use a quote.
String and central inverters commonly need replacing within the array life. Use the manufacturer warranty and your O&M plan.
Cost at the replacement year in today's money terms, not discounted. Applies to the peak AC output the tool calculates.
Used for net present value, discounted payback and discounted cost per kWh. Real terms: leave inflation out of both this rate and the energy price escalation.
0 is the conservative planning default.
Salvage or resale value of the array in the final year, in today’s money. 0 is the conservative default.
Roof reinforcement or re-roof, switchgear, protection and utility study costs.
Checklist before design.
  • Structural capacity, wind and seismic uplift
  • Roof condition and remaining life
  • Shading from penthouses, equipment and trees
  • Fire-service access and maintenance paths
  • Cleaning plan and water access
  • Utility interconnection and export arrangements
  • Coordination with the essential electrical system

Backup power: PV alone does not keep the hospital running in an outage. Backup needs a separately engineered storage and electrical-control arrangement.

Equations: kWdc = (roof ft² × usable % × Wdc/ft² + canopy ft² × Wdc/ft²) ÷ 1,000. Year-1 kWh = kWdc × yield. Used on site = sum over a representative day of min(half-sine PV output, flat solar-hour load) × 365; the annual balance min(generation, solar-hour demand) is shown only as an optimistic upper bound. The remainder is exported at the export price or curtailed. Payback = installed cost ÷ (year-1 value − O&M). Yield source: NREL PVWatts. Cost and prices are your inputs. Annual model only.

Worked example

A 120,000 ft² roof (45% usable at 11 Wdc/ft²) plus 60,000 ft² of canopy (15 Wdc/ft²) fits 1,494 kWdc and makes 2.24 GWh in year 1. At $0.12/kWh all of it is used on site in the representative-day model because the hospital draws 12,300 MWh in solar hours: $268,920 of value against $26,892 of O&M. Because the daytime load is large, the floor-load and midday-peaking cases agree here (payback 12.3 years in all three). A hospital that used only 1,500 MWh in solar hours with a 40 kW minimum would use 1.29 GWh on site in the central case (not the 1.5 GWh annual balance), with a range of 0.15 to 1.50 GWh and a payback range from 19.6 years to never: the result then depends on load matching, which needs hourly data. Installed cost is $2.99 million including a $150,000 allowance, so simple payback is 12.3 years. Peak AC output of 1,195 kW is below the 1,800 kW minimum daytime demand, so little midday export is expected. The next step is a yield, structural and interconnection study, not a purchase.

Independent planning estimate using published US government factors. Not endorsed by DOE, EPA, NREL or any agency. Not an audit or a verified inventory. See methods.