Energy baseline and opportunity screen
Enter 12 months of electricity, fuel and water to get an energy and carbon baseline and a list of systems to investigate first.
What this page is: one calculator that runs in your browser and stores nothing. Sources and limits are on the calculators page; for a linked 42-sheet model use the engineering toolkit.
About this tool
What it does: Turns 12 months of electricity, fuel and water into an energy and carbon baseline and points to where to look first.
Background: A baseline is the starting point for every efficiency, solar and storage decision; interval data adds load factor and base load.
Benefit: Shows which systems (chiller plant, controls, steam and hot water, water) deserve measurement and engineering review first.
Equations, units, assumptions and limits
Units: kWh/month, therms/month, kgal/month, kW, ft2, kg/kWh, $/kWh, $/therm; results in kWh/ft2, kBtu/ft2/yr, tCO2, %.
Default assumptions: Example 500,000 ft2 hospital with 12 months of data. Grid factor 0.348 kg/kWh (eGRID2023 national). Flag thresholds (25% electric swing, 70% base-to-peak, 40% summer fuel) are screening rules of thumb, not standards.
Limits: Annual and monthly totals only. Not a weather-normalized baseline or an IPMVP/M&V baseline: the heating degree-day input gives a simple ratio only. Peak and base demand are numbers you enter, not analysis of an interval time series. Natural gas only: other fuels are not included. Opportunity flags tell you where to measure, not what you will save.
Level: screening estimate. It supports planning and prioritizing, not design, procurement or a performance guarantee. Detailed engineering by qualified local professionals is required before any project.
Equations: Site EUI = (kWh × 3.412 + therms × 100) ÷ ft². Load factor = (annual kWh ÷ 8,760) ÷ peak kW. Base ratio = base kW ÷ peak kW. Electric swing = (highest month − lowest month) ÷ highest month. Scope 2 = kWh × kg/kWh ÷ 1,000; Scope 1 = natural gas therms × 0.005291 t. Median: ENERGY STAR. Opportunity flags are screening rules of thumb, not standards. Start with at least 12 months; add interval data where available.
Worked example
A 500,000 ft² hospital enters 12 months of data: 22.35 GWh of electricity, 679,000 therms of natural gas and 46,800 kgal of water, with a 3,800 kW peak and 2,300 kW base load. The tool returns a site EUI of 288 kBtu/ft² (about 23% above the ENERGY STAR hospital median), a load factor of 67%, a base load of 61% of peak and 11,370 tCO₂ (7,778 Scope 2, 3,593 Scope 1, with no T&D loss uplift). Electricity swings 31% between February and July, which points first to the chiller plant and pumping. Summer fuel use is 36% of the winter peak, so steam, reheat and hot water are worth a survey. These are places to measure, not savings, and this is not a weather-normalized or IPMVP baseline.
Planning estimate, not engineering design or professional advice. Results depend on your inputs and published factors, and are not a verified inventory, audit, guarantee of savings or net-zero claim. See the terms of use.
Independent planning estimate using published US government factors. Not endorsed by DOE, EPA, NREL or any agency. Not an audit or a verified inventory. See methods.