Hospital Net Zero

Measurement and verification basics

How to separate measured savings from estimates, adjust a baseline for weather and changes, and document the result.

Track 5: Energy and sustainabilityIntermediate25 minutesNot started

Review status. Draft for author review. Independent technical review pending. Educational example, not a design basis. Educational and screening material only. It supports qualified professional judgment and does not determine code compliance, replace your hospital's policies or the advice of qualified engineers, clinicians and infection-prevention staff.

1. Concept

Savings cannot be seen on a meter, because the meter shows what was used, not what would have been used. Measurement and verification (M&V) estimates the avoided energy by comparing actual use with an adjusted baseline.

The key discipline is honesty about what was measured and what was only estimated. A saving that is measured, adjusted and documented is far more credible than one calculated from a nameplate.

2. Engineering principles

3. Code and guidance

4. Worked calculation: avoided natural gas in one month

  1. Baseline model from 12 months of data: gas (therms) = 4,000 + 12 x heating degree-days.
  2. Reporting month: 600 degree-days. Predicted baseline = 4,000 + 12 x 600 = 11,200 therms.
  3. Measured use in the reporting month = 9,800 therms. Avoided = 11,200 - 9,800 = 1,400 therms (12.5 percent).
  4. A new wing adds about 500 therms a month (a non-routine adjustment). Adjusted baseline = 11,700 therms. Avoided = 11,700 - 9,800 = 1,900 therms.
  5. Without the non-routine adjustment, the saving would be understated. Always document why an adjustment was made.

5. Hospital scenario

A vendor claims 20 percent savings from a controls project and offers no metered data. How would you design a measurement plan to confirm the claim?

Discuss with your team. There is no single answer; compare your reasoning with the principles above.

6. Assessment

Five original questions with explanations. Your best score is saved on this device only.

Question 1. What does M&V estimate?
Question 2. A hospital adds a new wing during the reporting period. This is a:
Question 3. In which IPMVP option are all parameters of the affected system measured?
Question 4. Why report measured and estimated savings separately?
Question 5. Weather-driven variation in a baseline is handled by:

7. Practical output: Checklist: M&V plan for an energy project

Related tools

Standards and references

Confirm the edition adopted for your project and jurisdiction. Standards are cited by name only; no standard text is reproduced here.

← Chilled water plant efficiency and delta-TNext: Life-cycle cost for hospital projects →