Utility M&V project tracker
Calculate avoided energy against an adjusted baseline and keep measured and estimated savings separate.
Evidence classification. The Basis and IPMVP option you pick are your own labels. This tool cannot verify meters, model fit or method conformity, so no result here is an independently verified saving. Rows with an invalid baseline (for example a negative predicted baseline) are rejected. Record the baseline and reporting periods, the data source and the reason for any adjustment.
Baseline model per project: predicted baseline = intercept + slope x driver (for example degree-days). Avoided energy = predicted baseline + non-routine adjustment - measured reporting-period energy. Mark each saving measured or estimated; the totals keep them apart.