Electrical tools
Cable voltage drop, standby generator, UPS battery runtime, transformer loading, power factor correction and short-circuit screening. Plus the emergency power assessment in the resilience tools.
Voltage drop calculator
Voltage drop, percentage drop and longest run for a cable, single or three phase, copper or aluminium, with parallel conductors.
Standby generator sizing screen
Continuous and motor-starting kVA screen for a standby generator, with site derating, margin and growth.
UPS battery runtime estimator
Estimate runtime from battery voltage and capacity with depth of discharge, ageing and temperature factors, or the capacity needed for a target.
Transformer loading and loss check
Loading, current, losses and efficiency of a distribution transformer, with a headroom flag.
Power factor correction sizing
Capacitor kvar to reach a target power factor and the current reduction, with harmonic and generator cautions.
Short-circuit level screening
Three-phase fault level from the source, transformer and cable impedances. A screen, not a study.